Ppap Checklist Excel _hot_
This feature uses a drop-down menu to filter the 18 standard PPAP elements , hiding irrelevant rows to reduce clutter and prevent missing critical data.
An effective Excel-based checklist should include the following structural components: PPAP checklist - EnerSys
Formal engineering clearance or approvals conducted at the customer’s testing facility before PPAP. 4. Design Failure Mode and Effects Analysis (DFMEA) ppap checklist excel
Your Excel sheet should list all 19 elements defined by the AIAG (Automotive Industry Action Group) manual. Below is the exact data structure you should replicate in your template: 1. Design Records
You can easily add, remove, or modify elements based on the required PPAP Submission Level (e.g., Level 1-5). This feature uses a drop-down menu to filter
Analysis identifying potential risks within the manufacturing process .
A checklist in Excel is an essential tool for ensuring that all 18 elements of the AIAG (Automotive Industry Action Group) standard are met before mass production begins. These templates typically serve as a centralized hub for managing submission levels (1 through 5), tracking document status, and ensuring cross-functional consistency. Key Features of a High-Quality Excel PPAP Checklist Design Failure Mode and Effects Analysis (DFMEA) Your
| | Element | Requirement Description | Status (Yes/No/NA) | Comment / Reference | Date Completed | |-----------|-------------|-----------------------------|------------------------|------------------------|--------------------| | 1 | Design Records | Part drawing, CAD model, specs | ☐ Yes / ☐ No / ☐ NA | | | | 1 | Engineering Change Docs | Approved ECN/ECR if applicable | ☐ Yes / ☐ No / ☐ NA | | | | 2 | DFMEA | Design Failure Mode Effects Analysis | ☐ Yes / ☐ No / ☐ NA | | | | 3 | Process Flow Diagram | Manufacturing process steps | ☐ Yes / ☐ No / ☐ NA | | | | 3 | PFMEA | Process Failure Mode Effects Analysis | ☐ Yes / ☐ No / ☐ NA | | | | 3 | Control Plan | In-process & final inspection plan | ☐ Yes / ☐ No / ☐ NA | | | | 4 | MSA (Gage R&R) | Measurement system analysis | ☐ Yes / ☐ No / ☐ NA | | | | 4 | Dimensional Results | Full layout inspection report | ☐ Yes / ☐ No / ☐ NA | | | | 4 | Material Test Results | Chemical, physical, or mechanical tests | ☐ Yes / ☐ No / ☐ NA | | | | 4 | Performance Test Results | Functional or reliability tests | ☐ Yes / ☐ No / ☐ NA | | | | 5 | Initial Process Capability (Cpk/Ppk) | Statistical process capability study | ☐ Yes / ☐ No / ☐ NA | | | | 5 | Qualified Lab Documentation | Lab accreditation (e.g., ISO 17025) | ☐ Yes / ☐ No / ☐ NA | | | | 5 | Appearance Approval Report (AAR) | For appearance-critical parts | ☐ Yes / ☐ No / ☐ NA | | | | 5 | Sample Product | Production sample – 1 per customer | ☐ Yes / ☐ No / ☐ NA | | | | 5 | Master Sample | Retained reference sample | ☐ Yes / ☐ No / ☐ NA | | | | 5 | Checking Aids | Fixtures, gauges, or tools | ☐ Yes / ☐ No / ☐ NA | | | | 5 | Customer-Specific Requirements | Per customer CSR matrix | ☐ Yes / ☐ No / ☐ NA | | | | 5 | Part Submission Warrant (PSW) | Signed final approval form | ☐ Yes / ☐ No / ☐ NA | | |
Design Failure Mode and Effects Analysis. Process Flow Diagram: Visual map of the production process.
) at the supplier facility based on the designated submission level. Level 3 (Default) 2. Engineering Change Docs 3. Customer Eng. Approval 4. DFMEA 5. Process Flow Diagram 6. PFMEA 7. Control Plan 8. MSA (Gage R&R) 9. Dimensional Results 10. Material/Perf. Tests 11. Initial Process Studies 12. Lab Documentation 13. Appearance Approval 14. Sample Parts 15. Master Sample 16. Checking Aids 17. Customer Requirements 18. Part Submission Warrant (PSW)